
Keep a Spreadsheet of Listings Updated Every Week in Sheets
Yes: keep one row per listing, keyed on the listing's own link, and let a weekly scheduled run add new listings, mark the ones that have gone and update the rest in place. That only works if the run sees the same pages you see, signed-in pages included. A sheet rebuilt from scratch every Monday throws away the most useful thing a weekly check can tell you, which listings left since last week. Treat the run as a reconciliation between the site and the sheet, and design the columns for that before you collect a single row.
A Prompt Template for a Weekly Listings Sheet
Open and go through every page of results.
For each listing, open it and get [FIELD 1], [FIELD 2] and [FIELD 3].
Create a Google Sheet called "" with the columns
[FIELD 1], [FIELD 2], [FIELD 3], Listing, First seen and Status,
one row per listing. Put the link to the listing in Listing
and today's date in First seen.
Every at , check the pages again: add new listings
with that day's date in First seen, set Status to "No longer listed"
for listings that are gone, set it back to "Listed" if one returns,
and update the rest in place, keeping the old [FIELD 1] in a Previous column.Each line has one job:
- Every page of results: a run that stops at page one will later mark everything on page two as removed.
- Open each listing: phone numbers, prices and descriptions often appear only on the detail page, never in the results grid.
- Listing: the link is the row's identity. Names and titles change; the URL of a listing rarely does.
- First seen and Status: together they turn a snapshot into a history. You can see when a listing appeared and whether it is still there, without deleting anything.
- The schedule line: a weekday and a time. Pick one when your computer is normally on.
- Previous column: ask for it on the one field whose change you care about, usually price, so the old value is not silently overwritten.
A filled version for a trade directory reads: "Open foodmakers-ohio.example/members and go through every page. For each member, open its listing and get the company name, website, city and phone. Create a Google Sheet called 'Ohio food makers' with the columns Company, Website, City, Phone, Listing, First seen and Status. Every Monday at 8:00, check the pages again: add new members, mark members no longer listed and update the rest in place."
What Updating a Listings Sheet Each Week Involves
A listings sheet that updates every week is a table where each row stands for one listing on a website, and a scheduled pass compares the live site with the table, adding rows that are new, flagging rows whose listing has disappeared and refreshing the fields of everything else. That makes it useful to anyone who acts on change: a sales team working a directory (our weekly lead list setup is one version), a buyer watching inventory, a researcher tracking a marketplace. It differs from an import formula in what it remembers. Google's help page on import functions describes IMPORTDATA as a function that imports data at a given URL in .csv or .tsv format. The same page notes that import functions update the result periodically, which suits data that changes often. A formula like that mirrors the source, so when a listing vanishes from the page it vanishes from your sheet too, with no trace that it existed, and it reads only what a page serves without your sign-in (the limits of IMPORTXML follow the same logic). A weekly reconciliation keeps the departed rows and says when they left.
Mistakes That Corrupt a Weekly Listings Sheet
Overwriting the whole sheet on each run feels tidy and destroys the history. The symptom shows up weeks later, when someone asks whether a listing was ever there and the sheet cannot say. Ask for updates in place plus a Status column, and never let a run clear the table. If the sheet grows long, filter Status rather than deleting rows.
Matching rows by name causes duplicates the first time a seller edits a title. "Riverside Bakery" becomes "Riverside Bakery LLC", and your sheet now holds two rows, one of them marked as removed. The fix is to make the listing link the key from the very first run. Retrofitting a key onto a sheet that already has duplicates means cleaning them by hand.
A partial read looks exactly like a mass removal. If a run hits a slow page, a cookie banner or a session that expired, it may see only a fraction of the results and mark the rest "No longer listed". Treat a sudden spike in removals as a reading problem until you have opened the site and confirmed those listings are really gone. Removals normally trickle in a few at a time.
Asking for fields the listing never shows produces blank or invented-looking columns. If a directory shows a company's website but no email, a column called Email will stay empty, and someone will assume the run failed. Ask only for what the listing page itself displays. Anyone used to collecting leads from directories learns this one quickly.
Scheduling the run for a time your computer is asleep leads to weeks with no update and no obvious error. With a tool that works in your own browser, choose a weekday morning when the laptop is open anyway.
Checking That the Weekly Run Does Its Job
Run these checks once after the first collection and again after the first scheduled update. The second pass matters more, because it is the first time the sheet has to reconcile instead of collect.
- Compare the row count with the site.
- Open five Listing links at random, including one from the last results page, and check that each field matches what the page shows.
- Look for duplicate links. In a spare column, a COUNTIF on the Listing column flags any URL that appears more than once.
- After the first scheduled run, filter First seen to that day's date and confirm the new rows are listings that really appeared that week.
- Filter Status to "No longer listed" and open every flagged link. A removed listing should return an error, a redirect or a "no longer available" notice.
- Check the Previous column on two or three rows whose price changed, so you know the old value was kept rather than lost.
Our earlier guide to collecting leads covers how to plan the columns of a lead sheet; these checks are what tells you the weekly second run deserves your trust.
Where BrowseWiz Takes Over the Weekly Run
You describe the listings once, in the words of the template above, and BrowseWiz collects them in your own Chrome and writes them into a new Google Sheet in your Drive. BrowseWiz reads sites you're signed into in your own Chrome, with no cookie or password upload. Rows link back to their source page when you ask for a source column. Scheduled refreshes update rows in place and can keep the old value in its own column when asked. Our page on scheduled sheet updates shows how the schedule is offered right after the first run.
There are no selectors or recorded clicks, so a redesigned page doesn't break the run. One plain-language message can cover several sites instead of a robot per site, which matters when the same kind of listing lives on three directories. The trade-off is the browser itself: scheduled refreshes and monitors run only while Chrome is open. If you need runs while your computer is off, a browser-based tool is the wrong fit for that sheet.
The same scheduled approach applies to paperwork. BrowseWiz can also download statements and invoices automatically, logging file name, size and status in a Google Sheet, which is the idea behind our monthly invoice routine.
If your listings sit behind a sign-in or spread across several sites, tell us about your listings source before you build the sheet, so the first prompt already carries the columns your weekly check depends on. When you are ready to schedule, compare the Free, Pro and Max plans.
Frequently Asked Questions
How do I automatically update data from one Excel sheet to another?
Inside one Excel workbook, a cell that references another sheet updates whenever the source cell changes, so a summary tab can read from a raw-data tab without copying. Across separate Google Sheets files, use IMPORTRANGE. In Google Sheets, IMPORTRANGE imports a range of cells from a specified spreadsheet. That is also the clean way to feed a scraped listings sheet into a workbook you already maintain: let the scheduled run keep its own sheet, then pull the columns you need into your existing file with IMPORTRANGE, where your formulas and formatting stay untouched.
Can you provide me with an Excel template for creating a weekly schedule?
A weekly schedule needs only a few columns: Week of, Day, Task, Owner and Done. For a listings routine, add a second tab as a run log with Run date, New listings, Removed listings and Changed prices, one row per week. Fill those counts with COUNTIF formulas pointed at the First seen and Status columns of your listings sheet. After a month, the log shows whether the market is moving or the run is misreading, because steady counts that suddenly jump usually point to the run rather than the site.
How to sort weekly data in Excel?
Add a helper column with the week number of each date, using WEEKNUM, then sort by that column and by date within it. Both Excel and Google Sheets have the function. For a listings sheet, sort by First seen, newest first, to put each week's arrivals at the top, and use a filter on Status rather than a sort when you want removals. Sorting a sheet that a scheduled run also writes to is safe when rows are keyed on their link, because the run finds each row by its Listing value, not its position.

About Tom
I'm a software engineer and solutions architect specializing in AI-driven tools and productivity software, passionate about helping users reclaim their valuable time through intelligent automation.
This article was written with AI and reviewed by Tom.